Sm 2016 12 05 Pub R00 Weeklyphotos Eb435barriercap 460×295

In The Space Between The Eb And Wb Lanes On I 435, Rock And Soil Are Added And Compacted, Then A Barrier Cap Is Poured In Place To Finish It Off. This Work Keeps Trash, Trees And Debris Out Of The Inside Barrier Area.

In The Space Between The Eb And Wb Lanes On I 435, Rock And Soil Are Added And Compacted, Then A Barrier Cap Is Poured In Place To Finish It Off. This Work Keeps Trash, Trees And Debris Out Of The Inside Barrier Area.