Sm 2016 03 28 Pub R00 Weeklyphotos Aerial Ei35deckdone2 460×295

The Concrete Deck Is Now Curing On The New I 435 At I 35 Two Lane Flyover Ramps. Ramps Are Anticipated To Open In The Next Several Weeks.

The Concrete Deck Is Now Curing On The New I 435 At I 35 Two Lane Flyover Ramps. Ramps Are Anticipated To Open In The Next Several Weeks.