Sm 2015 04 13 Pub R00 Weeklyphotos Wi18deckpour Vibratorandfill 460×295

Deck Was Poured On April 16, 2015 For The New, Two Lane Flyover Ramp From Eb K 10 To Nb I 435. Crews Pour Concrete And Use A Vibrator To Shift It Into All The Empty Space Between Rebar And Deck Panels.

Deck Was Poured On April 16, 2015 For The New, Two Lane Flyover Ramp From Eb K 10 To Nb I 435. Crews Pour Concrete And Use A Vibrator To Shift It Into All The Empty Space Between Rebar And Deck Panels.