2015 01 20 Pub R00 Weeklyphotos Rennerdigwork1 Sm 460×295

Crews Measure The Depth Inside A Dig Site Off Renner Blvd. Near The K 10 Ramps. This Interchange Will Be Reconstructed In The Coming Months. The Right Lane Of Sb Renner Blvd. Is Closed For 60 Days At This Time.

Crews Measure The Depth Inside A Dig Site Off Renner Blvd. Near The K 10 Ramps. This Interchange Will Be Reconstructed In The Coming Months. The Right Lane Of Sb Renner Blvd. Is Closed For 60 Days At This Time.