2014 10 27 Pub R00 Weeklyphotos Collegeasphalt3 Sm

Pouring Curb And Gutter Is A Necessary Part Of Roadway Installation. This Photo Was Taken On College Boulevard, The Week Of The Traffic Switch To The South. College Boulevard Should Have All Four Lanes Open To Traffic On Dec. 1, 2014.

Pouring Curb And Gutter Is A Necessary Part Of Roadway Installation. This Photo Was Taken On College Boulevard, The Week Of The Traffic Switch To The South. College Boulevard Should Have All Four Lanes Open To Traffic On Dec. 1, 2014.