2014 07 8 Pub R00 Weeklyphotos Collegeneview Gradingwork Sm 432×295

Topsoil Removal And Grading Work Is Taking Place On The North Side Of College Boulevard In Preparation For Widening College Boulevard To Two Lanes Between Renner Boulevard And Ridgeview Road. The Slope Seen In This Photo Hints At Some Of The Grade Difference Between The Current And Future Roadway.

Topsoil Removal And Grading Work Is Taking Place On The North Side Of College Boulevard In Preparation For Widening College Boulevard To Two Lanes Between Renner Boulevard And Ridgeview Road. The Slope Seen In This Photo Hints At Some Of The Grade Difference Between The Current And Future Roadway.