2014 07 10 Pub R00 Weeklyphotosi435ati35 Deckpour Allcrewwork Sm

The Deck Widening Work At I 435 And I 35 Is Nearing Completion With A Concrete Pour. The Concrete Truck Parks In A Lane Drop To Access The Deck, And Crews Move Quickly To Spread And Finish The Concrete Before The Next Truck Comes. 7 Cubic Yards Of Concrete Were Added To This Deck Approximately 3 Truckloads.

The Deck Widening Work At I 435 And I 35 Is Nearing Completion With A Concrete Pour. The Concrete Truck Parks In A Lane Drop To Access The Deck, And Crews Move Quickly To Spread And Finish The Concrete Before The Next Truck Comes. 7 Cubic Yards Of Concrete Were Added To This Deck Approximately 3 Truckloads.