alertJohnson County Gateway Phase 2 Construction is now complete. Be aware of additional lane closures as other construction projects begin.

EB I-435

/Tag:EB I-435
­

Short Term Closures

With all lane, road and ramp closures expect some level of traffic delay.  ALL WORK IS WEATHER PERMITTING!

ALL INFORMATION FOR CONSTRUCTION WORK ON  U.S 69 & I-435 and K-10 WEST OF RIDGEVIEW ROAD CAN BE FOUND ON THE KDOT WEBSITE:

www.ksdot.org/kcmetro/laneclose.asp.

I-435 & Lackman Road

no current traffic impacts.

I-435 Eastbound & Westbound, Northbound & Southbound

Thursday, March 30, 9 p.m. to Friday, March 31, 5 a.m.

Northbound I-35 TWO RIGHT LANES from 119th Street to I-435 CLOSED.

Westbound I-435 TWO RIGHT LANES from I-35 to K-10 CLOSED.

Friday, March 31 9:00 p.m. to Saturday, April 1, 5 a.m.

Northbound I-35 TWO RIGHT LANES from 119th Street to I-435 CLOSED.

Westbound I-435 TWO RIGHT LANES from I-35 to K-10 CLOSED.

Saturday, April 1 9:00 p.m. to Sunday April 2, 5 a.m.

Northbound I-35 TWO RIGHT LANES from 119th Street to I-435 CLOSED.

Westbound I-435 TWO RIGHT LANES from I-35 to K-10 CLOSED.

I-35 Northbound & Southbound

 

No current traffic impacts.

 

I-35 & 95th Street Interchange

No current traffic impacts.

K-10 Eastbound and Westbound

No current traffic impacts.

 

K-10 & Renner Boulevard Interchange

No traffic impacts scheduled at this time.

K-10 & Ridgeview Road Interchange

No traffic impacts scheduled at this time.

College Boulevard

No traffic impacts at this time.

 

ALL INFORMATION FOR CONSTRUCTION WORK ON K-10 WEST OF RIDGEVIEW ROAD CAN BE FOUND ON THE KDOT WEBSITE:  www.ksdot.org/kcmetro/laneclose.asp.

Traffic will be directed through the project work zone via signage and cones. Drivers should expect some delays through the project work zone during the lane and ramp closures. For full traffic alerts, click on the link below.

Updated daily traffic information for this interchange project can be viewed at: www.jocogateway.com and for the entire Kansas Metro Area at: www.ksdot.org/kcmetro/laneclose.asp.

The Kansas Department of Transportation urges all motorists to be alert, obey the warning signs, and “Give ‘Em a Brake!” when approaching and driving through the project work zone.

I-435 & Lackman Road Interchange 10-Day Ramp Closure

TRAFFIC ALERT

 

FOR IMMEDIATE RELEASE  

May 13, 2016

News Contact:  Kimberly Qualls, (785) 640-9340 or kqualls@ksdot.org

Map_LackmanRoadtoEBI-435rampclosure_MarkedDetour_FullClosures_2016-05-11

I-435 & Lackman Road Interchange 10-Day Ramp Closure

 

10-DAY SHORT-TERM RAMP CLOSURE: Lackman Road to eastbound I-435 ramp CLOSED for bridge demolition work, 24/7, round the clock, beginning at 10 p.m. on Monday, May 16 and reopening at 5 a.m. on Thursday, May 26, weather permitting. Marked detour via southbound Lackman Road to eastbound College Boulevard to northbound Quivira Road to eastbound I-435.

 

Advance message boards will alert drivers to the 10-day ramp closure. Marked detours will be provided as follows. See marked detour map above.

 

Updated daily traffic information for the #jocogateway interchange project can be viewed at: www.jocogateway.com and for the entire Kansas City Metro Area at: www.ksdot.org/kcmetro/laneclose.asp.

 

The Kansas Department of Transportation urges all motorists to be alert, obey the warning signs, and “Give ‘Em a Brake!” when approaching and driving through the project work zone.

Eastbound I-435 MAJOR TRAFFIC SHIFT from Santa Fe Trail Drive to U.S. 69

TRAFFIC ALERT

FOR IMMEDIATE RELEASE  

March 24, 2016

News Contact:  Kimberly Qualls, (785) 640-9340 or kqualls@ksdot.org

JCG_I-435LaneSplit_3-lane_Text_8.5x11_April2016_2016-03-22_Page_1

 

Eastbound I-435 MAJOR TRAFFIC SHIFT from Santa Fe Trail Drive to U.S. 69

NEW SPLIT LANE TRAFFIC SHIFT: Eastbound I-435 traffic will be shifted to THREE THROUGH LANES, including one new split lane of traffic, from Santa Fe Trail Drive to U.S. 69 for roadway widening work beginning at 10 p.m. on Monday, April 11 through Late Fall 2016, weather permitting.

> > > Here’s what this means for drivers:

Two left (through) lanes of eastbound I-435 will cross over the existing median to the north and run adjacent to the westbound I-435 lanes. Concrete barrier located on the outside of the two lanes will separate the eastbound I-435 traffic from the westbound I-435 traffic (as shown in the graphic below). Traffic in these two through lanes will have NO access to exit to Quivira Road, U.S. 69 or Antioch Road.

One right (through) lane of eastbound I-435 will remain south of the existing median barrier. Concrete barrier will be located on either side of this single lane (as shown in the graphic below). Traffic in this right through lane will have access to exit to Quivira Road, U.S. 69 or Antioch Road.

See the graphics above and below for a visual understanding of these traffic movements.

 

JCG_I-435LaneSplit_3-lane_Text_8.5x11_April2016_crosssection_2016-03-23

Traffic Alert: Overnight ramp closure NB I-35 to WB I-435

FOR IMMEDIATE RELEASE
March 1, 2015
News Contact: Kimberly Qualls, (785) 640-9340 or kqualls@ksdot.orgMap_I-435toI-35Ramp_Detour_LoopClosure_2016-02-29

Northbound I-35 to Westbound I-435 Loop Ramp Closure

WEEKDAY OVERNIGHT RAMP CLOSURE: Northbound I-35 to westbound I-435 loop ramp CLOSED overnight for flyover ramp bridge deck pour beginning at 10 p.m. on Friday, Mach 4 and reopening to all traffic at 9 a.m. on Saturday, March 5, weather permitting.

Advance message boards will alert drivers to the ramp closure. Traffic will be directed through the project work zone via cones, barricades and signage. Drivers should expect delays during the overnight ramp closures and must use alternate routes

A marked detour will be provided via portable message boards. Northbound I-35 traffic will detour via eastbound I-435 to Quivira Road then back onto westbound I-435. See marked detour map above.

Updated daily traffic information for this interchange project can be viewed at: www.jocogateway.com and for the entire Kansas City Metro Area at: www.ksdot.org/kcmetro/laneclose.asp.

The Kansas Department of Transportation urges all motorists to be alert, obey the warning signs, and “Give ‘Em a Brake!” when approaching and driving through the project work zone.

Overall #JoCoGateway Phase Two Project work is scheduled to be completed in December 2016. (KDOT Project #435-46 KA-1002-06)

Lackman Road to Eastbound I-435 Long-Term Ramp Closure

TRAFFIC ALERT – REMINDER!
FOR IMMEDIATE RELEASE
August 12, 2015
News Contact: Kimberly Qualls, (785) 640-9340 or kqualls@ksdot.org

Map_LackmanRampClosure_2015-08-06 Lackman Road to eastbound I-435 detour routes

Lackman Road to Eastbound I-435 Long-Term Ramp Closure–Closure date rescheduled
EXPECT DELAYS! 24/7 LONG-TERM RAMP CLOSURE: Lackman Road to eastbound I-435 entrance ramp will be CLOSED, 24/7 round the clock, for full ramp reconstruction work beginning at 10 p.m. on Friday, August 14 and will reopen to all traffic on Sunday, November 1, weather permitting.
SPECIAL NOTE > > > The NEW Renner Boulevard to eastbound K-10 ramp will OPEN on Friday evening, August 14 prior to the Lackman Road to eastbound I-435 ramp closing. The other eastbound Renner Boulevard ramps are scheduled to reopen on Monday, August 17, weather permitting.
Advance message boards will alert drivers to the ramp closure. A marked detour will be provided (see detour map above). Southbound Lackman Road ramp traffic will detour via westbound College Boulevard to northbound Renner Boulevard to the new Renner Boulevard to eastbound K-10 ramp to access eastbound I-435. An optional recommended detour route for southbound Lackman Road traffic is eastbound College Boulevard to Quivira Road to access eastbound I-435. Northbound Lackman Road ramp traffic will detour via westbound 95th Street to access the I-435 ramps.
Drivers should expect delays during the ramp closure and must use alternate routes. Traffic will be directed through the project work zone via signage, cones and barricades.