alertJohnson County Gateway Phase 2 Construction is now complete. Be aware of additional lane closures as other construction projects begin.

Traffic Alerts

/Traffic Alerts
­

Short Term Closures

With all lane, road and ramp closures expect some level of traffic delay.  ALL WORK IS WEATHER PERMITTING!

ALL INFORMATION FOR CONSTRUCTION WORK ON  U.S 69 & I-435 and K-10 WEST OF RIDGEVIEW ROAD CAN BE FOUND ON THE KDOT WEBSITE:

www.ksdot.org/kcmetro/laneclose.asp.

I-435 & Lackman Road

no current traffic impacts.

I-435 Eastbound & Westbound, Northbound & Southbound

Thursday, March 30, 9 p.m. to Friday, March 31, 5 a.m.

Northbound I-35 TWO RIGHT LANES from 119th Street to I-435 CLOSED.

Westbound I-435 TWO RIGHT LANES from I-35 to K-10 CLOSED.

Friday, March 31 9:00 p.m. to Saturday, April 1, 5 a.m.

Northbound I-35 TWO RIGHT LANES from 119th Street to I-435 CLOSED.

Westbound I-435 TWO RIGHT LANES from I-35 to K-10 CLOSED.

Saturday, April 1 9:00 p.m. to Sunday April 2, 5 a.m.

Northbound I-35 TWO RIGHT LANES from 119th Street to I-435 CLOSED.

Westbound I-435 TWO RIGHT LANES from I-35 to K-10 CLOSED.

I-35 Northbound & Southbound

 

No current traffic impacts.

 

I-35 & 95th Street Interchange

No current traffic impacts.

K-10 Eastbound and Westbound

No current traffic impacts.

 

K-10 & Renner Boulevard Interchange

No traffic impacts scheduled at this time.

K-10 & Ridgeview Road Interchange

No traffic impacts scheduled at this time.

College Boulevard

No traffic impacts at this time.

 

ALL INFORMATION FOR CONSTRUCTION WORK ON K-10 WEST OF RIDGEVIEW ROAD CAN BE FOUND ON THE KDOT WEBSITE:  www.ksdot.org/kcmetro/laneclose.asp.

Traffic will be directed through the project work zone via signage and cones. Drivers should expect some delays through the project work zone during the lane and ramp closures. For full traffic alerts, click on the link below.

Updated daily traffic information for this interchange project can be viewed at: www.jocogateway.com and for the entire Kansas Metro Area at: www.ksdot.org/kcmetro/laneclose.asp.

The Kansas Department of Transportation urges all motorists to be alert, obey the warning signs, and “Give ‘Em a Brake!” when approaching and driving through the project work zone.

Long-Term Closures

All long-term closures on the project have been completed!!!

 

 

 

 

 



 

 

 

 

 

 

I-35 & I-435 INTERCHANGE via TRAFFIC SLOWDOWN this Thursday, May 26 at 1:45 P.M.

FOR IMMEDIATE RELEASE  

May 24, 2016

News Contact:  Kimberly Qualls, (785) 640-9340 or kqualls@ksdot.org

I-35 & I-435 INTERCHANGE SHORT-TERM FULL INTERCHANGE CLOSURE

WEEKDAY TRAFFIC SLOWDOWN VIA SHORT-TERM FULL INTERCHANGE CLOSURE: A FULL CLOSURE of the I-35 and I-435 interchange, including all lanes and adjacent ramps from K-10 to U.S. 69 and 95th Street to 119th Street in all directions (a minimum of 1/4-mile around the interchange) will take place as traffic is stopped briefly, approximately 10-15 minutes, so crews can remove a massive bridge girder as part of the flyover ramp demolition work at approximately 1:45 p.m. this Thursday, May 26, weather permitting.

The public will be alerted late morning on Thursday, May 26, weather permitting, regarding the demolition work and the traffic slowdown via the variable message boards and KC Scout signs on the highways prior to the start of the traffic slowdown.

KDOT, GIC and law enforcement will assist with this full short-term interchange closure. Drivers should expect a delay of up to 15 minutes during the short-term closure and are encouraged to use alternate routes, if possible.

The Kansas Department of Transportation urges all motorists to be alert, obey the warning signs, and “Give ‘Em a Brake!” when approaching and driving through the project work zone.

Special Alert 10-day lane closure EB I-435 K-10 to Pflumm Rd.

SPECIAL TRAFFIC ALERT 

FOR IMMEDIATE RELEASE  

May 16, 2016

News Contact:  Kimberly Qualls, (785) 640-9340 or kqualls@ksdot.org

image004

 

 

Eastbound I-435 from K-10 to Pflumm Road

MAJOR SHORT-TERM 10-DAY LANE CLOSURES: Eastbound I-435 from K-10 to Pflumm Road REDUCED TO TWO THROUGH LANES for flyover bridge ramp demolition work beginning at 10 p.m. TODAY, Monday, May 16 and reopening at 5 a.m. on Thursday, May 26, weather permitting. (See map above for a visual of the lane closure area location.)

 

This 10-day lane closure is in the location where the eastbound I-435 left two lanes crossover to the westbound side of the median, which means the eastbound I-435 left two lanes will remain open in this area, while the lane that stayed on the right will now be closed. Traffic wishing to access Quivira Road or U.S. 69 would previously stay in that right lane at the lane split, just past Lackman Road, but with that lane now closed, drivers will be required to crossover at I-35. Eastbound I-435 access to Quivira Road and U.S. 69 will be provided via a new single lane crossover, back to the east side of the median, just past I-35.

 

Drivers that travel eastbound K-10 and southbound/eastbound I-435 in this area will see increased traffic delays, especially during rush hour commutes, morning primarily. Drivers should allow extra time, should pay extra special attention and follow all signage for their daily commute routes through this area, as traffic patterns will be changing tonight.

 

Updated daily traffic information for the #jocogateway interchange project can be viewed at: www.jocogateway.com and for the entire Kansas City Metro Area at: www.ksdot.org/kcmetro/laneclose.asp.

 

The Kansas Department of Transportation urges all motorists to be alert, obey the warning signs, and “Give ‘Em a Brake!” when approaching and driving through the project work zone.

 

Overall #JoCoGateway Phase Two Project work is scheduled to be completed in December 2016. (KDOT Project #435-46 KA-1002-06)

 

I-35 & I-435 Interchange Flyover Ramp Bridge Demolition Closures

TRAFFIC ALERT

 

FOR IMMEDIATE RELEASE  

May 13, 2016

News Contact:  Kimberly Qualls, (785) 640-9340 or kqualls@ksdot.org

I-35 & I-435 Interchange Flyover Ramp Bridge Demolition Closures

WEEKEND-LONG FULL ROAD CLOSURE: All lanes of eastbound I-435 at I-35 FULLY CLOSED for bridge demolition work beginning at 8 p.m. on Friday, May 20 and reopening at 5 a.m. on Monday, May 23, weather permitting. All lanes of westbound I-435 at I-35 FULLY CLOSED for bridge demolition work beginning at 10 p.m. on Friday, May 20 and reopening at 5 a.m. on Monday, May 23, weather permitting.

Advance message boards will alert drivers to the weekend-long full road closures. Marked detours will be provided as follows. See marked detour map below.

Map_435FullClosure_Detour_Update_2016-05-12

 

Updated daily traffic information for the #jocogateway interchange project can be viewed at: www.jocogateway.com and for the entire Kansas City Metro Area at: www.ksdot.org/kcmetro/laneclose.asp.

 

The Kansas Department of Transportation urges all motorists to be alert, obey the warning signs, and “Give ‘Em a Brake!” when approaching and driving through the project work zone.

 

Overall #JoCoGateway Phase Two Project work is scheduled to be completed in December 2016. (KDOT Project #435-46 KA-1002-06)